Herzog Contracting Corp.

PROJECT EXPERIENCE

DCTA A-train CM/GC

Herzog was the managing joint venture partner for this CM/GC commuter rail project for DCTA. We were responsible for constructability reviews, value engineering, and field construction and testing. The project featured construction of 21 miles of Class IV single track with three passing sidings, five new station platforms and three park-and-ride facilities. The project included constructing 24 bridges, 43 road crossings, a vehicle maintenance facility and an eight mile bike path. The project cost decreased from the original project price due to value engineering and partnering measures. Every aspect of the design was scrutinized for alternate methods and materials in a value engineering process. This process resulted in a $32 million savings.

  • Location: Lewisville, Texas
  • Owner: DCTA
  • Cost: $192.7 million
  • Completion: 2012
  • System Type: Commuter Rail

 

DCTA A-train CM/GCDCTA A-train CM/GCDCTA A-train CM/GC