Herzog Contracting Corp.

PROJECT EXPERIENCE

EXPO LRT Phase 2 Design-Build

Herzog is the dedicated track subcontractor for this Design-Build contract. This is a new 6.6 mile light rail transit alignment that is an extension to the existing system. Once complete, the line will connect downtown Los Angeles to downtown Santa Monica. Track installation includes 49,783 track feet of ballasted track, 3,520 track feet of direct fixation track, 11,081 track feet of embedded track, and 2,880 track feet of slab track. We work along a corridor that stretches through a dense, urban environment with heavy vehicular and pedestrian traffic. We are coordinating closely with the municipalities, businesses, and emergency services within our work corridor to ensure minimal disruption.

  • Location: Los Angeles, California
  • Owner: Expo Metro Line Construction Authority
  • Cost: $31 million
  • Completion: 2014
  • System Type: Light Rail

 

EXPO LRT Phase 2 Design-BuildEXPO LRT Phase 2 Design-BuildEXPO LRT Phase 2 Design-BuildEXPO LRT Phase 2 Design-BuildEXPO LRT Phase 2 Design-Build