Green Line CM/GC 1

Herzog was the dedicated track subcontractor for this CM/GC 13 mile light rail project. During preconstruction, we reviewed designs and construction means and methods to deliver $37 million in cost savings. The project was built alongside an existing freight railroad, through residential, light industrial and urban areas including the heart of downtown Dallas. With 47 street crossings and over six miles of reconstructed storm and water utilities located under “live-traffic-streets,” a well-planned and implemented traffic control plan was used to protect the workers, pedestrians, and motorists.

  • Location: Dallas, Texas
  • Owner: DART
  • Cost: $423 million
  • Completion: 2010