Herzog Contracting Corp.


Green Line CM/GC 3

Herzog was a part of the equity joint venture group awarded the contract by DART to complete this alternative delivery CM/GC light rail transit system expansion project. We constructed 12.5 miles of track, with 8.7 miles of the corridor raised on a viaduct. This project was in an urban environment with many external constraints ranging from addressing 92 road crossings, working alongside live track conditions, coordinating with Dallas Love Field airport flight traffic, pedestrians and vehicular traffic, complex utility coordination, and mitigating the impact on surrounding areas.

  • Location: Dallas, Texas
  • Owner: DART
  • Cost: $471 million
  • Completion: 2010
  • System Type: Light Rail