Herzog is a key track contractor for this large design-build contract. The project scope includes 10 miles of double light rail track, grade-separated guideway, traction power substations, high voltage substations, a communication system, passenger drop-off facilities, surface and structured parking facilities, bus transit centers, a pedestrian bridge, real estate acquisition, utility relocation, drainage improvements, environmental mitigation, startup and revenue testing, and other elements necessary for project delivery. Our crews are working on a new alignment that travels at-grade, above-grade, and below-grade (in trenched segments and in a subway through downtown San Jose). The project includes two elevated stations.

  • Location: Milpitas, California
  • Owner: Santa Clara Valley Transportation Authority
  • Cost: $781 million
  • Completion: Under Construction
  • System Type: Light Rail


Silicon Valley Berryessa Design-BuildSilicon Valley Berryessa Design-BuildSilicon Valley Berryessa Design-Build