Lifted Logic Web Design in Kansas City clock location phone play check_box_outline_blank check_box chevron-down chevron-left chevron-right chevron-up facebook instagram linkedin google plus pinterest radio_button_checked radio_button_unchecked x arrow-up send globe marker close controls Spotify applepodcasts

2021 South Region Turnout Program PKG B

Fort Worth, TX

Client

Union Pacific Railroad (UPRR)

Delivery Method

Bid-Build

Division

HCC

Capability
Rail Construction

Construction

Details

Year Started
2021
Year Completed
2021
Project Elements
  • Freight rail

Overview

This project involved the assembly and delivery of 30 turnouts for the Union Pacific Railroad (UP) at locations along four subdivisions in Texas and Louisiana. Between January and February 2021, six turnouts (four #11 turnouts and two #15 turnouts) were constructed on the Monroe Subdivision in Olla, LA. In August, project crews assembled three turnouts (two #11 turnouts and one #15 turnout) on the Corsicana Subdivision in Athens, TX. An additional 12 turnouts (seven #11 turnouts and five #15 turnouts) were constructed on the Mineola Subdivision in Longview, TX. In November, project crews completed the project with the assembly of the last nine turnouts (nine #9 turnouts) on the Dallas Subdivision in Fort Worth, TX. All turnouts were 136RE. 

+
A-train Commuter Rail CM/GC
Division

HCC

Capability
Rail Construction
+
Green Line CM/GC-1, Line Sections SE-1, SE-2, and NW-1B
Division

HCC

Capability
Rail Construction
+
Silver Line Regional Rail Project
Divisions
  • HCC
  • HCC
Capabilities
  • Rail Construction
  • Positive Train Control
  • Wayside Signal & Communications