Lifted Logic Web Design in Kansas City clock location phone play check_box_outline_blank check_box chevron-down chevron-left chevron-right chevron-up facebook instagram linkedin google plus pinterest radio_button_checked radio_button_unchecked twitter youtube arrow-up send globe marker close controls

BART/VTA Silicon Valley Berryessa Extension

Milpitas, CA

Client

Santa Clara Valley Transportation Authority (VTA)

Delivery Method

Design-Build

Division

HCC

Capability
Rail Construction

Construction

Details

Year Started
2012
Year Completed
2017
Project Elements
  • Light rail

Overview

The VTA Berryessa Extension is the first phase of the Bay Area Rapid Transit Silicon Valley Expansion. This 10-mile LRT extension of the BART system begins south of the Warm Springs station in Fremont, proceeds through Milpitas and ends in the Berryessa area of north San Jose. As part of the design-build joint venture, Herzog is constructing 10 miles of double track third rail (five miles of which is located adjacent to UPRR track) and building two new stations with parking facilities. Work scope also involves the demolition of existing track, 3rd party relocates substantial structures and mass excavation at the Milpitas station site. New track (direct fixation and ballasted) will be installed along the corridor on multiple bridges and in tunnels.

+
MBTA Green Line Extension
Division

HCC

Capability
Rail Construction
+
RTD West Rail Line CM/GC
Division

HCC

Capability
Rail Construction
+
SMART Larkspur Extension Phase 1
Division

HCC

Capability
Rail Construction