Lifted Logic Web Design in Kansas City clock location phone play check_box_outline_blank check_box chevron-down chevron-left chevron-right chevron-up facebook instagram linkedin google plus pinterest radio_button_checked radio_button_unchecked twitter youtube arrow-up send globe marker close controls

DART Silver Line Regional Rail Project

Ft. Worth, TX

Client

Dallas Area Rapid Transit (DART)

Delivery Method

Design-build

Divisions
  • Herzog Contracting Corp.
  • Herzog Technologies, Inc.
Capabilities
  • Rail Construction
  • Positive Train Control
  • Wayside Signal & Communications

Construction

Details

Year Started
2019
Year Completed
In progress
Project Elements
  • Commuter rail

Overview

Archer Western Herzog JV is the prime contractor for the build of this new start commuter rail project—a 26-mile double-track system (52 track miles of ballasted track construction) with 10 stations extending between the Dallas/Fort Worth (DFW) International Airport and Shiloh Road in Plano. The alignment passes through three counties and seven cities: Grapevine, Coppell, Dallas, Carrollton, Addison, Richardson, and Plano and interchanges with three existing DART light rail transit lines (the Red/Orange lines in Plano, the Green Line in Downtown Carrollton, and the Orange Line at DFW) and Trinity Metro’s TEXRail Commuter Rail Line at DFW. Additional project elements include clearing and grubbing, civil works, and system and signals, inclusive of positive train control (PTC). Additional integration activities will be closely coordinated with Trinity Metro to allow full interoperability between the Silver Line and TEXRail commuter rail systems.

+
DCTA A-Train CM/GC
Division

HCC

Capability
Rail Construction
+
PTC Hosting – TEXRail
Division

HTI

Capability
Positive Train Control
+
TEXRail
Division

HTSI

Capabilities
  • Rail Transit Maintenance
  • Passenger Rail Operations