Lifted Logic Web Design in Kansas City clock location phone play check_box_outline_blank check_box chevron-down chevron-left chevron-right chevron-up facebook instagram linkedin google plus pinterest radio_button_checked radio_button_unchecked twitter youtube arrow-up send globe marker close controls

FDOT Central Florida Commuter Rail Transit Phase 2 South (SunRail)

Kissimmee, FL

Client

Florida Department of Transportation

Delivery Method

Design-Build

Division

HCC

Capability
Rail Construction

Construction

Details

Year Started
2016
Year Completed
2018
Project Elements
  • Commuter rail

Overview

As part of the design-build joint venture, Herzog was responsible for the final design, engineering, construction, testing, and commissioning for the new 18-mile SunRail commuter rail system extending from the Sand Lake Road station in Orange County to the Poinciana station in Osceola County on the existing Central Florida Rail Corridor (CFRC) right-of-way. Major project elements include the construction of the track, three bridges, four stations with ample parking, and a Vehicle Storage and Light Maintenance Facility (VSLMF). The scope also included all communications, civil, structural, and roadway work.

+
FDOT SunRail Signal Maintenance-of-Way
Division

HTSI

Capability
Maintenance-of-Way
+
SFRTA Segment 5 Double Track Corridor Improvement Program
Division

HCC

Capability
Rail Construction
+
SunRail PTC Systems Integration
Division

HTI

Capabilities
  • Positive Train Control
  • GIS Data Collection & Management