Lifted Logic Web Design in Kansas City clock location phone play check_box_outline_blank check_box chevron-down chevron-left chevron-right chevron-up facebook instagram linkedin google plus pinterest radio_button_checked radio_button_unchecked twitter youtube arrow-up send globe marker close controls

SCRRA Orange County Service Expansion and Grade Crossing Enhancements

Orange County, CA

Client

Southern California Regional Rail Authority (SCRRA)

Delivery Method

Bid-Build

Division

HCC

Capability
Rail Construction

Construction

Details

Year Started
2009
Year Completed
2011
Project Elements
  • Commuter rail

Overview

Herzog was the prime contractor for the construction of this 40-mile commuter rail expansion. The project was adjacent to BNSF and UPRR live track, where daily coordination of work activities was performed. These work activities included the construction of various storm drainage systems and structures, numerous live track tie-ins, new ballasted track, grading, utility relocation and protection, modification of two station platforms, and installation of new special trackwork. Quiet zone safety improvements were made at 52 at-grade railroad crossings that passed through nine cities.

+
BART/VTA Silicon Valley Berryessa Extension
Division

HCC

Capability
Rail Construction
+
LACMTA EXPO LRT Phase 2
Division

HCC

Capability
Rail Construction
+
SFRTA Segment 5 Double Track Corridor Improvement Program
Division

HCC

Capability
Rail Construction