Lifted Logic Web Design in Kansas City clock location phone play check_box_outline_blank check_box chevron-down chevron-left chevron-right chevron-up facebook instagram linkedin google plus pinterest radio_button_checked radio_button_unchecked x arrow-up send globe marker close controls Spotify applepodcasts

MoDOT I-35 Various Counties Resurfacing Project

Andrew & Buchanan Counties, MO

Client

Missouri Department of Transportation

Delivery Method

Bid-Build

Division

HCC

Capability
Highway/Asphalt Paving

Construction

Details

Year Started
2022
Year Completed
2022
Project Elements
  • Roadway

Overview

Herzog’s Heavy Highway team constructed this project on Interstate 35 from Cameron, MO north approximately 15-miles. The project was a 2 inch mill and resurfacing project, using one of the highest quality Superpave Mix Designs on the mainline that MoDOT requires. As part of MoDOT’s continued effort to improve their road quality, the project also had a Balanced Mix Design (BMD) Performance Testing and Increased Density specification requirement. This new BMD proved to be both a challenge and success as the Heavy Highway Quality Control group worked through designing and building a superior mix that the laydown crews were able to achieve maximum incentive bonuses for performance criteria, leading to one of the best pavements the division has ever constructed. Additionally, the project had Concrete Pavement Repair Patching, Asphalt Patching, Guardrail Improvements, Pavement Markings and Drainage Improvements.