Lifted Logic Web Design in Kansas City clock location phone play check_box_outline_blank check_box chevron-down chevron-left chevron-right chevron-up facebook instagram linkedin google plus pinterest radio_button_checked radio_button_unchecked twitter arrow-up send globe marker close controls Spotify applepodcasts

Dave Friehl


Herzog Contracting Corp. – Vice President of Rail Construction – National Construction

Dave has 39 years of experience in construction, including 33 years supervising LRT, streetcar, heavy rail, commuter rail, and other rail construction projects. He leads our track construction efforts across North America and is tasked with assembling optimal field teams for all track installation. Since joining the team in 1991, Dave has overseen work on more than 20 rail projects during his tenure at Herzog including the MBTA Green Line Extension, CTDOT CP243 Interlocking / Danbury Dockyard Improvements, CTDOT Replacement of Walk Bridge over the Norwalk River, FDOT Central Florida Commuter Rail Transit Phase 2 South (SunRail 2), SMART IOS 1 and 1a Design-Build, and Frontrunner North and South CM/GC.

Prior to Herzog, Dave worked on several large CM/GC projects as a subcontractor to Herzog and spent four years performing maintenance-of-way work for the Burlington Northern Railroad.

He is a proven general superintendent/construction manager and railroad trackwork construction manager. He coordinates well with agencies, owners, stakeholders, and subcontractors on challenging, tightly scheduled projects, including those where his crews are operating under live-track conditions.

Dave’s projects have earned outstanding safety records with timely completion. Additionally, he was recognized as the winner of the NRC Field Employee of the year for 2012 to honor his achievement of no lost time for two million man-hours worked.

View all Leadership