Herzog designed and built the Rail Unloading Machine (RUM). The self-contained unit travels highways and rails under its own power, mounts easily onto existing rails, and goes to work unloading rail from a CWR train. Within an hour, the RUM can unload 10-12 rails eliminating the need for extensive manpower and greatly reduces the risk of injury.