Lifted Logic Web Design in Kansas City clock location phone play check_box_outline_blank check_box chevron-down chevron-left chevron-right chevron-up facebook instagram linkedin google plus pinterest radio_button_checked radio_button_unchecked x arrow-up send globe marker close controls Spotify applepodcasts

Brightline Phase 2 Expansion – Zone 4

us

Client

Brightline

Delivery Method

Bid-Build

Divisions
  • Herzog Contracting Corp.
  • Herzog Technologies, Inc.
Capability
Rail Construction

Construction

Details

Year Started
2019
Year Completed
In Progress
Project Elements
  • Commuter rail

Overview

This express intercity passenger rail system expansion project consists of track and signal capacity improvements and new Class VI rail infrastructure to achieve maximum allowable train speeds of 110 mph within this 129-mile double track rail corridor. Scopes of work include 400,000 cubic yards of excavation, relocating 107 miles of fiber optic, 100,000 square feet of retaining walls, 159 modified and upgraded grade crossings, 35 turnouts, 29 crossovers, one million tons of ballast, 106 miles of new track, shifting 55 miles of existing track, upgrading 30 miles of existing mainline and siding track, 28 new bridges with the longest bridge structure at 1,667 feet in length, and new signal and wayside infrastructure including 250 new signal houses and an I-ETMS Positive Train Control system. All work is performed within the active FECR rail corridor.

+
Brightline Phase 2 Expansion – Zone 3
Division

HCC

Capability
Rail Construction
+
Brightline Track and Signal Maintenance
Division

HCC

Capability
Rail Construction
+
SunRail Phase 2 South
Division

HCC

Capability
Rail Construction