Lifted Logic Web Design in Kansas City clock location phone play check_box_outline_blank check_box chevron-down chevron-left chevron-right chevron-up facebook instagram linkedin google plus pinterest radio_button_checked radio_button_unchecked x arrow-up send globe marker close controls Spotify applepodcasts

FDOT SunRail Phase 2 Commuter Rail System Signal Installation

Orlando, FL

Client

Central Florida Rail Corridor (CFRC)

Delivery Method

Bid-Build

Division

HTI

Capability
Wayside Signal & Communications

Signals & Communications

Details

Year Started
2016
Year Completed
2018
Project Elements
  • Commuter rail

Overview

Herzog managed the design, constructed the buildout, as well as performed the in-service testing and commissioning of the wayside signal and grade crossing system. The project encompassed upgrading 24 existing locations and the addition of 6 new pedestrian crossing locations. Along with the crossing work, Herzog installed multiple new locations and updated existing wayside locations across the 18-mile commuter rail extension to allow for the addition of double track.

+
FDOT SunRail Signal Maintenance-of-Way
Division

HTSI

Capability
Maintenance-of-Way
+
SunRail Phase 2 South
Divisions
  • HCC
  • HCC
Capabilities
  • Rail Construction
  • Wayside Signal & Communications
+
SunRail PTC Systems Integration
Division

HTI

Capabilities
  • Positive Train Control
  • GIS Data Collection & Management