Lifted Logic Web Design in Kansas City clock location phone play check_box_outline_blank check_box chevron-down chevron-left chevron-right chevron-up facebook instagram linkedin google plus pinterest radio_button_checked radio_button_unchecked x arrow-up send globe marker close controls Spotify applepodcasts

CSX Intermodal Fairburn Capacity Expansion

Fairburn, GA

Client

CSX Transportation

Delivery Method

Bid-Build

Division

HCC

Capability
Rail Construction

Construction

Details

Year Started
2018
Year Completed
2019
Project Elements
  • Freight rail

Overview

This freight rail facility expansion project involved the construction of eight, 7,000 lf transfer tracks within this 103-acre CSX facility. Crews demolished and relocated 35,000 ft of existing track, installed 20 #10 turnouts, and constructed 50,000 ft of Class I track (steel tie and wood tie) using new and used materials provided by CSX. The expansion resulted in increased facility capacity from 350,000 lifts per year to 750,000 lifts per year.

+
Pier 400 Corridor Storage Tracks Expansion
Division

HCC

Capability
Rail Construction
+
POLA Berth 200 Rail Yard Project
Division

HCC

Capability
Rail Construction