Lifted Logic Web Design in Kansas City clock location phone play check_box_outline_blank check_box chevron-down chevron-left chevron-right chevron-up facebook instagram linkedin google plus pinterest radio_button_checked radio_button_unchecked x arrow-up send globe marker close controls Spotify applepodcasts

SMART Larkspur Extension Phase 1

San Rafael, CA

Client

Sonoma-Marin Area Rail Transit District

Delivery Method

Design-Build

Division

HCC

Capability
Rail Construction

Construction

Details

Year Started
2017
Year Completed
2019
Project Elements
  • Commuter rail

Overview

As part of a design-build joint venture, Herzog constructed a 2.1-mile extension to the 43-mile Sonoma-Marin Area Rail Transit District (SMART) IOS-1 & IOS-1 from downtown San Rafael to the Golden Gate Transit Larkspur Ferry terminal in Marin County, CA. Major project elements included one new station in Larkspur near the ferry terminal, five public at-grade roadway crossings (including signals and crossing equipment), refurbishment of one existing railroad trestle bridge, and replacement of another trestle bridge. The project provided a gap in the region’s fixed guideway transit network between the end of the IOS and the ferry terminal, improving mobility in the congested US 101 corridor.

+
Caltrain Express Program – CTX North and South
Division

HCC

Capability
Rail Construction
+
SMART IOS-1 & IOS-1A
Division

HCC

Capability
Rail Construction
+
SunRail Phase 2 North
Division

HCC

Capability
Rail Construction