Lifted Logic Web Design in Kansas City clock location phone play check_box_outline_blank check_box chevron-down chevron-left chevron-right chevron-up facebook instagram linkedin google plus pinterest radio_button_checked radio_button_unchecked x arrow-up send globe marker close controls Spotify applepodcasts

South Shore Line Double Track Project 1

Gary, IN

Client

Northern Indiana Commuter Transportation District (NICTD)

Delivery Method

Bid-Build

Division

HCC

Capability
Rail Construction

Construction

Details

Year Started
2021
Year Completed
In progress
Project Elements
  • Commuter rail
  • Freight rail

Overview

This electrified commuter rail capacity expansion project includes construction of new second mainline tracks and other rail infrastructure improvements within a 26.6-mile section of NICTD’s existing South Shore Line (SSL) between Gary and Michigan City in Indiana. Construction elements include a total of 16.9 miles of ballasted track, the removal of approximately two miles of embedded, in-street tracks from the roadway and reconstruction of the two tracks in a separate, parallel right-of-way in Michigan City, a new overhead contact system, four new railroad bridge structures over roadways and Class 1 railroads, new or modified railroad signals and associated control systems – including PTC systems, reconstruction of 14 at-grade crossings including new and modified grade crossing warning equipment, culvert replacements, retaining walls (wing walls, headwalls, and toe walls), passenger platform upgrades at five stations, and additional surface parking lots.

+
Brightline Phase 2 Expansion – Zone 4
Divisions
  • HCC
  • HCC
Capability
Rail Construction
+
Green Line Extension (GLX)
Division

HCC

Capability
Rail Construction
+
Mid-Coast Corridor Transit Project
Division

HCC

Capability
Rail Construction